Did you know Optimized Building represents a comprehensive approach to the entire building process, encompassing design, construction, and life-cycle operation? The concept is defined by seven key elements, including a Collaborative Data Environment for streamlined collaboration, modular building types with standardized chassis, pre-assembled construction modules, standardized templates and workflows for multi-disciplinary efficiency, a novel CIPO business framework for empowering smaller businesses, selling modular buildings with defined design options to balance flexibility and workflow efficiency, and scalable building sales involving standardized manufacturing schedules. The objective is to reduce risks, increase profits, and ultimately deliver higher quality, higher performance buildings to the market in shorter timeframes and at lower costs.
Search The Build Blog
Recent Posts
- DYK – How does the BoD impact on Optimized Building and meeting BUSA’s mission?
- What is the Design-Build Construction Method? A Quick Introduction
- DYK – Who controls how the BoD are changed and implemented?
- DYK – Over the centuries,what has driven change in the (BoD)?
- 5 Stages of an Architectural Design Process